VAE Group have been engaged by Hansen Yuncken on the final stage in the redevelopment of Lismore Base Hospital (LBH) to undertake the Mechanical Services upgrade and ongoing preventative maintenance.
Image Source: Hansen Yuncken (Twitter)
The final stage at LBH involves the refurbishment of C block and the front entry to the hospital, including:
VAE scope of work includes the supply and installation of 2 x AHUs, 35 FCUs, a new VRV system, stair pressurisation systems, and modifications to existing ductwork, air diffusion and ventilation systems to blocks A, B and C of the LBH.
We are excited to be working on our first project with Hansen Yuncken and continuing our work on site at LBH.
At VAE Group we engineer, construct and manage Smarter HVAC and Technology Solutions. With over 400 staff across Australia, New Zealand and Papua New Guinea, we pride ourselves on providing Built in Certainty for our clients.
Copyright © VAE Group. All rights reserved | Website by SBIM | Privacy Policy