EDGY Building

About the project

Category

Client

Badge Constructions

Year

2016

Value

$5.6M

The Project

VAE were engaged by BADGE Construction to design and deliver the mechanical services within the new EDGY building at the University of Southern Queensland’s (USQ) Springfield Campus. The new building consists of a working TV studio with supporting production rooms, flexible teaching spaces, executive offices and meeting rooms, laboratories, café and bookshop as well as multi-purpose media rooms with dedicated areas such as rehearsal rooms.
The EDGY building was designed and built to achieve a 5-star rating under the Green Star Education V1 criteria. This system includes environmental improvements such as increasing the outside air rates within the building, improved circulation, demand-based ventilation through the use of carbon dioxide monitoring and control, improved setpoint and control to raise the thermal comfort levels, exclusion of hazardous materials such as formaldehyde and products giving off high Volatile Organic Compounds (VOCs), and high efficiency Heating Ventilation and Air Conditioning (HVAC) systems to reduce the carbon footprint of the site.
img-0563-jpg
engineer

Engineering

construct

Contruction

Industrial

Management

Smarter HVAC Solution

During the construction of the EDGY Building, the university was undergoing a separate project (being completed by another contractor) involving their existing central energy plant (CEP). The CEP project experienced a major pipework failure (main chilled water line imploded), due to incorrect isolation of plant. This resulted in the University having no Air Conditioning (AC) within any of their existing operational buildings. VAE were requested to assist in getting the AC at the University up and running, we had the plant back online within 48 hours. BADGE’s Services Manager, Ian Smith, said that there was “no other company in Brisbane who could provide the Engineers, Automation Technicians ad Plumbers to rectify the problem that quickly.”

Services

BMS

BMS controlling central energy, plant replaced and reprogrammed in 48 hours.

Maintenance

Collapsed section of 350mm diameter chilled water pipe removed and new pipe installed within 48 hours.

Testing

System tested and commissioned to have system fully functional for Monday morning lectures.

Project Gallery

Work with us

VAE engineers, constructs and manages ‘Smarter HVAC Solutions’. Our methodology is based on our value of ‘Built in Certainty’. This means that we have the people and technology to thoroughly assess the challenge and identify the smartest ways to build in certainty into your building assets.

Our people ensure we deliver a fit-for-purpose solution that achieves optimum performance and maximises value throughout your asset’s lifecycle. With industry capabilities and expertise we can offer candidates a range of career opportunities in various  locations across Australia, New Zealand and PNG.

Related Projects