The Project

Badge Constructions awarded VAE the supply, installation, commissioning, and 12 months DLP maintenance of the mechanical services for Griffith University Nathan Campus – Building N80 Chiller Plant West.
VAE also installed two new low level and two base load high efficiency water cooled chillers with new plantroom, to replace the existing central chilled water plant. The new plant included four new cooling towers, associated pumps, and new Mechanical Services Switchboards (MSSB). Extensive inground chilled water reticulation pipework was required to connect the new Building N80 Chillers to the Griffith University Nathan Campus chilled water infrastructure that serves the existing and future planned buildings.

Key Achievements

01

Extensive inground HDPE pipework within an operational University campus

02

Cutover of the new chilled water precinct to the existing University “on-line”

02

Complex logistics associated with placing the chillers within the new plantroom carried out by our VAE rigging team

Project Gallery

Work with us

VAE engineers, constructs and manages ‘Smarter HVAC Solutions’. Our methodology is based on our value of ‘Built in Certainty’. This means that we have the people and technology to thoroughly assess the challenge and identify the smartest ways to build in certainty into your building assets.

Our people ensure we deliver a fit-for-purpose solution that achieves optimum performance and maximises value throughout your asset’s lifecycle. With industry capabilities and expertise we can offer candidates a range of career opportunities in various  locations across Australia, New Zealand and PNG.

Related Projects