Mater Private Hospital

About the project

Category

Location

Brisbane

Client

Mater Health Services

Year

2018

Value

$5.4m

The Project

VAE were directly contracted by Mater Health Services as the Head Contractor for a major retrofit of the Mater Private Hospital in Brisbane. The complex staged replacement of 23 Air Handling Units (AHU), their associated (3-off) Mechanical Services Switch Boards (MSSB), and the site wide Building Management System (BMS). All undertaken within a live operational hospital environment, replacing critical HVAC equipment first placed into service in 1993.
Through effective and clear communications with all stakeholders, VAE planned and delivered a complex alternative cutover staging design that “changed the game” and saved the client significant capital expenditure. VAE worked closely with Mater and DMA Consultants to add significant value management benefit to the project, helping the client overcome initial budget shortfalls.
mater-hospital-16-1548899510-jpg
engineer

Engineering

construct

Construction

Safety

Management

Key Achievements

01

Game-changing alternate design offered by VAE

02

Significant CAPEX savings for Mater

03

Minimised anticipated disruption to Hospital operations significantly
mater-hospital-level-5-after-jpg

VAE's Smarter HVAC Solution

VAE worked in partnership with the project consultants (DMA) to develop an alternative design philosophy for the main air handling plantroom, significantly reducing the ductwork and plant footprint of the space by re-purposing the entire plantroom as a common pre-conditioned plenum. This pivotal change in the design removed significant ductwork and cost, significantly reducing the client’s investment amount and improving servicing accessibility to the plantroom as a whole. In addition, we also identified an alternative electrical arrangement for the project utilising existing electrical infrastructure in lieu of new cabling, allowing for staged cutover of services, reduced client investment, and entirely removing the need for a full electrical shutdown of the hospital as originally planned.

Key Statistics

2
hours maximum transition period per live system
2
air handling units

Best HVAC Retrofit or Upgrade AIRAH Awards 2019

VAE and DMA proudly accepted the National AIRAH Industry award for Best HVAC Retrofit or Upgrade in 2019 READ MORE here link to news update AIRAH AWARDS 2019 WINNER

Project Gallery

[acf_image_carousel]

Work with us

VAE engineers, constructs and manages ‘Smarter HVAC Solutions’. Our methodology is based on our value of ‘Built in Certainty’. This means that we have the people and technology to thoroughly assess the challenge and identify the smartest ways to build in certainty into your building assets.

Our people ensure we deliver a fit-for-purpose solution that achieves optimum performance and maximises value throughout your asset’s lifecycle. With industry capabilities and expertise we can offer candidates a range of career opportunities in various  locations across Australia, New Zealand and PNG.

Related Projects